Installation manual

SS-3N/IR/STD, SS-3N/IR/WH Installation
10 10/24/11 Bradley Corporation • 215-1493 Rev. G; ECM 11-08-011
7
Connect Electrical and Sprayhead Supplies
Snap the transformer's
circuit plug into the female
transformer circuit plug.
B
Connect the sensor circuit
plug from the sprayhead to
the solenoid circuit plug.
A
WARNING: The Express® control must be connected with the 24 VAC Class II transformer provided. Connections
to 110 VAC can cause personal injury and will result in damage to the electronics. Connection of leads other than
shown may cause permanent damage to the sensor.
Loosen the compression nuts.
Push the sprayhead supply tubes firmly into
the tube connectors until they are fully seated.
Tighten the compression nuts by hand.
C
Reinstall the valve bracket. Turn on the water supply and check for leaks. Turn on the electrical power to the electrical outlet
and pass your hand in front of each station’s sensor until all the air is purged from the lines and water is flowing smoothly.
Reinstall the access panel.
START-UP NOTE: Wait two full minutes after making the power connection before using the lav. The sensors will take up to
eight full minutes (while not in use) to adapt to the bowl if another object is detected during the two-minute start-up period.
C
Black Supply Tube
(from sprayhead)
Green Supply Tube
(from sprayhead)
Red Supply Tube
(from sprayhead)
Black Spade Terminal
Green Spade
Terminal
Red Spade
Terminal
H
C
A
Loosen the cap screw
about ¼" (4–6 turns)
and lift up the cover
(do not remove).
B
Using the cover, turn the
cartridge gently until
desired water temperature
is reached. Do not turn past
stops as this may damage
the unit. Push the cover
down and tighten the screw.
This valve is NOT factory preset. Upon installation, the temperature of this
valve must be checked and adjusted to ensure delivery of a safe water
temperature. Water in excess of 110°F (43°C) may cause scalding.
8
Adjust the Temperature