Installation TDB3108 Terreon 54" Circular Deep Bowl Washfountain with Air Metering Valve ® TDB3108 with Push Button Air Valve Available in standard height, juvenile height, and TAS height. WF3208 Terreon Extra Height 54" Circular Classic Washfountain with 9" Deep Bowl and Air Metering Valve ® Table of Contents WF3208 with Push Button Air Valve 215-1471 Rev. F; ECN 13-00-001 © 2013 Bradley Page 1 of 24 1/23/2013 Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . .
TDB3108, WF3208 Installation IMPORTANT! Read this entire installation manual to ensure proper installation. When finished with the installation, file this manual with the owner or maintenance department. Installation Packing List IS TH SIDE UP • • • • Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
TDB3108, WF3208 Installation Circular Washfountain Dimensions Model TDB3108 Model TDB3108 54" Circular - side view 54" Circular with optional accessories - side view Adjust to Towel Dispenser Mounting Holes 54" (1372) 6" (152) 47-1/4" (1200) 43-3/4" (1111) 34" (864) 63-5/8" (1616) w/ soap 55-1/8" (1400) w/o soap 10" (254) 23-1/2" (597) 47-1/4" (1200) 34" (864) 55-3/4" (1416) 19-1/2" (495) 36" (914) 43-3/4" (1111) 10" (254) 23-1/2" (597) 19-1/2" (495) Model TDB3108 is ADA Compliant 36" (914
TDB3108, WF3208 Installation Circular Washfountain Dimensions Model TDB3208 Model TDB3208 54" Circular - side view 54" Circular with optional accessories - side view 54" (1372) Adjust to Towel Dispenser Mounting Holes 6" (152) 47-1/4" (1200) 63-5/8" (1616) w/ soap 55-1/8" (1400) w/o soap 43-3/4" (1111) 10" 34" (254) (864) 23-1/2" (597) 55-3/4" (1416) 19-1/2" (495) 37-1/2" (953) Model TDB3208 is not ADA Compliant 47-1/4" (1200) 34" (864) 43-3/4" (1111) 10" (254) 23-1/2" (597) 19-1/2" (495) 37-
TDB3108, WF3208 Installation Rough-In Specifications Type A Drain (mm) Off-line vent with supplies from below 1" NPT Supplies Through Floor, Stub Up 2-1/2" (64) Above Floor 7-5/8" 7-5/8" (194) (194) Hot Cold 2" NPT Drain Through Floor, Stub up 3" (76) Above Floor 4" (102) 54" (1372) Bowl Supply lines for one to two washfountains should be 1"; for three washfountains 1-1/4". For more than 3 washfountains, pipe sizes should be increased proportionately.
TDB3108, WF3208 Installation Rough-In Specifications Type B Drain (mm) Centrally rising vent with supplies from above 1" NPT Supplies From Above Must Reduce to 1/2" Nominal Copper Tube on These Centers to Pass Thru Washfountain 7/8" (22) 7/8" (22) 2" NPT Drain Through Floor, Stub Up 3" (76) Above Floor Hot 1-1/4" (32) Cold 1/2" NPT Vent to Ceiling 4" (102) Supply lines for one to two washfountains should be 1"; for three washfountains 1-1/4".
TDB3108, WF3208 Installation 1 Installing the Drain A Rough in supply and drain piping as required for your installation. B Assemble the drain to the dimension for the bowl you are installing. All piping shown in dotted lines to be supplied by installer.
TDB3108, WF3208 2 Installation Bowl/Pedestal Mounting and Assembly CAUTION! Bowl surface is very smooth. Approximate weight of bowl is 190 pounds. Handle with Care! A Top View Threaded Rods (4) Places Floor Mounting (4) Places Position the pedestal making sure the floor mounting holes (4) line up. Mark the mounting-hole positions. TAS OPTION: Place TAS spacer on floor over the mounting holes. Place pedestal on top of the spacer.
TDB3108, WF3208 Installation 4a Air Metering Valve Assembly for A Drain and O Drain Units without Tie Pipe Option A B Install hemmed end (not sharp end) of support tube with gasket onto bowl. Tie Rod Pre-Pack Connect 1/2" supply tubing to sprayhead with 3/8" NPT to 1/2" tube connector and place sprayhead onto support tube. Run the tubing down through the support tube and connect to valve tube connector.
TDB3108, WF3208 4a D Installation Air Metering Valve Assembly for A Drain and O Drain Units without Tie Pipe Option continued... Place the actuator module assembly on top of sprayhead. Rotate until actuator module locks in with tie bar. Drop 1/8" diameter tube down to valve assembly and connect to the air valve. Skip to step F for units without soap.
TDB3108, WF3208 Installation 4b Air Metering Valve Assembly for B Drain and H Drain Units with Tie Pipe Option A Install hemmed end (not sharp end) of support tube with gasket onto bowl. B Connect 1/2" supply tubing to sprayhead with 3/8" NPT to 1/2" tube connector and place sprayhead onto support tube. Run the tubing down through the support tube and connect to valve tube connector. C Insert the 1-1/2" vent pipe (supplied by installer) down through the support tube and thread into vented trap.
TDB3108, WF3208 4b Installation Air Metering Valve Assembly for B Drain and H Drain Units with Tie Pipe Option continued... D Place the actuator module assembly on top of the sprayhead. Drop 1/8" diameter tube down to the valve assembly and connect to the air valve. UNIT WITH “H” DRAIN AND ACTUATOR MODULE SHOWN, ALSO AVAILABLE WITH “B” DRAIN Top Cover Skip to step F for units without soap. E Soap Dispenser For units with soap option, slide the spacer and soap dispenser over the 1-1/2" pipe.
TDB3108, WF3208 Installation 5 Valve and tubing connections Flush supply lines before making connections. Connect 1/2" dia. tubing to tee and solenoid assembly, two places. The male connector for the valve assembly will remain tight and leakproof when tubing is cut and installed properly. Follow the procedures below when installing tubing to ensure that you achieve a leakproof seal. A • Using a sharp razor, cut tubing squarely and remove any burrs. DO NOT pinch or crush end of tubing.
TDB3108, WF3208 6 Installation Adjust the Temperature This valve is NOT factory preset. Upon installation, the temperature of this valve must be checked and adjusted to ensure delivery of a safe water temperature. Water in excess of 110°F (43°C) may cause scalding. A 14 Check the temperature when approximately 1.0 GPM water flow is reached and adjust if necessary (the range of the valve is 95°F–115°F (35°C–43°C)).
TDB3108, WF3208 Installation Cleaning and maintenance instructions for Terreon ® Material Description: Terreon is an NAHB Certified densified solid surface material composed of polyester resin and is resistant to chemicals, stains, burns and impact. Surface damage can be easily repaired with everyday cleansers or fine grit abrasives. ® Routine Cleaning: Clean daily or as often as conditions require using a standard commercial or household cleaner such as Formula 409 or Windex .
TDB3108, WF3208 Installation Cleaning and maintenance instructions for stainless steel Material Description: Stainless steel is extremely durable, and maintenance is simple and inexpensive. Proper care, particularly under corrosive conditions, is essential. Always start with the simplest solution and work your way toward the more complicated. Routine cleaning: Daily or as often as needed use a solution of warm water and soap, detergent, or ammonia.
TDB3108, WF3208 Installation Soap Valve — Liquid — S09-007S Parts List Attaching Parts S09-007S Item Part No. Description 1 118-025 Valve Body 1 2 110-007 Packing Nut 1 3 135-001L Spring 1 4 125-001BU Washer 1 5 119-028 Plunger 1 * 161-014 Nut 1 * 124-001D Washer 2 * 142-002AH Washer - Stainless Steel 1 3 1 Qty 4 5 2 * Not Illustrated This valve delivers a measured amount of soap with each upward stroke.
TDB3108, WF3208 Installation Soap Valve — Powdered — S09-010A Parts List Item Part No. Qty 1 160-069 1 Screw, 1/4-20 RD 2 142-002X 1 Washer, 1/4 Split-Lock 3 S62-002 1 Agitator / Slide Assy. 4 192-004 1 Lever - Powdered Soap 1 2 Description 3 4 Reducer plugs are available for use with fine granulated soap to reduce the flow. Valves can be changed from powdered to liquid by plugging the innermost, or “bearing” hole with rubber plug, part number 125-001AK.
TDB3108, WF3208 Installation Sprayheads — Standard w/Neoprene Spray Ring Grommet Repair kit does not include sprayhead grommet. Order as a separate item. 1 4 3 2 5 9 7 10 6 8 Parts List Sprayhead Assembly S05-054B Item Part No.
TDB3108, WF3208 Installation Actuator Module Components U-Cup* (125-099) Piston* (119-227A) Duckbill Check* (198-010) Spring* (135-065) Screw (160-165) Actuator Body* (118-279) Pushbutton Assembly (S08-324) Straight Tube Connector* (169-890) Nut (110-115) Acutator Bracket (140-743) * Included in Actuator Assembly (S65-168) Metering Air Valve Maintenance Adjust Air Valve Meter Time The air valve timer is located next to the tube connector on the air valve body.
TDB3108, WF3208 Installation Repair Kits and Troubleshooting – Metering Air Valve Turn off water supplies to the unit before troubleshooting.
TDB3108, WF3208 Installation Manual Mixing Valve Repair Parts Valve Assembly S01-038 Item Valve Assembly S01-038S Valve Assembly S01-038A Valve Assembly S01-038AS Repair Kit S45-197 Part No. Description Qty.
TDB3108, WF3208 Installation Vernatherm Thermostatic Mixing Valve (S01-525) Parts List Parts List – S65-259 Valve Repair Kit Item Part No. Qty. Description 5 S39-413 1 Thermostat 7 125-001BX 1 O-Ring 8 125-157 1 O-Ring 10 1 Bradley • 215-1471 Rev.
TDB3108, WF3208 Installation Thermostatic Mixing Valve Troubleshooting Before attempting to troubleshoot the valve or disassemble the components, check for the following conditions: • If stop/check valves are used, make sure that they are fully open. • Make sure that the hot and cold inlet pipes are connected properly, and that there are no cross-connections or leaking stop/check valves. • Check the hot water heater output to make sure that it is at least 20° F above the set temperature.