Premier 2-Zone Controller model 140202 Installer Guide Controlador de 2 zonas premier modelo 140202 Guía de instalación Régulateur 2 zones de première qualité modèle 140202 Guide de l’installateur English, 1-11 Español, 12-22 Français, 23-33 140202-100-002
CONTENTS 1 Specifications 4 Configuration 2 Suitable Mounting Locations 5 System Checkout 3 Wiring Diagrams 6 Operation Warning • Read all of the instructions before proceeding. • Always turn off power to the heating/air conditioning system prior to installing or adjusting the Premier 2-Zone Controller. Wire the entire panel before applying transformer power. • This controller should only be installed and configured as described in this manual.
2 Suitable Mounting Locations Mount the Premier 2-Zone Controller panel near the HVAC equipment (see Figure 2). The panel can be mounted in any orientation on a wall, stud, roof truss, or the return-air plenum. For appearance, mount the panel level. Remove the panel cover and use the base as a template to drill mounting holes 4.5” apart (see Figure 3). Attach the panel with appropriate screws (not included). Use mounting anchors as needed for drywall or plaster installations.
3 Wiring the Panel Always turn off power to the heating/air conditioning system prior to installing or adjusting the Premier 2-Zone Controller. Wire the entire panel before applying transformer power. Use the following general wiring instructions for all systems. Specific wiring will vary depending on the equipment and type of system (conventional or heat pump). 3.1 Damper Wiring Install the system dampers using the instructions provided by the manufacturer.
3.2 Thermostat Wiring Install the system thermostats using the instructions provided by the manufacturer. Connect the thermostats to the zone panel as shown. Notes: • Wiring to the C terminal is required only for thermostat power. • E terminal at thermostat 1 controls emergency heat. See E-Heat Switch Installation Sheet TSB-0708-01 for wiring details. Rh E Rc R Y Y G G W W C C Thermostat Zone Panel 3.
3.4 Conventional System Wiring Note: For a heat pump system, see Section 3.5. Connect a conventional heating system to the zone panel as shown. RH For a single stage heating and cooling system, the 2nd stage connections are not used. Y G HOT 24 VAC RC 1st stage compressor control 1st stage heat control W1 EH W2 O/B For a system using a dual transformer, open jumper J1 (see Configuration section, Figure 4). Make sure the neutrals (common) are connected.
4 Configuration Use the following instructions to configure the Premier 2-Zone Controller. 1. Open J1 jumper for dual transformer installations. 2. Open J2 short cycle protection jumper for system test. Note: Replace J2 when system testing is completed or leave J2 open if compressor has built in short cycle protection.
3. Set the DIP switches to meet system requirements.
[ ] Verify green heartbeat LED in middle of panel is pulsing. [ ] Verify zone LEDs near damper terminals are green. [ ] Switch zone 1 thermostat to heat mode, and call for heat in zone 1 by raising set temperature above room temperature. [ ] Verify zone 1 damper LED stays green (open) and zone 2 damper LED changes to red (closed). [ ] Verify heating system is operating, air is moving out zone 1 vents, and zone 2 vents have minimal airflow.
6 Operation The Premier 2-Zone Panel has LEDs to tell the installer and homeowner the current operating mode of the panel. Refer to Figure 5 and the following descriptions of the panel LEDs for operation information. Callout LED Description 1 Heartbeat Flashes once per second when the panel is normal. 2 RH and RC Lights when the HVAC equipment transformer(s) are receiving power. Available only when C equipment terminal is wired.
1 Braeburn 2-Zone JI REMOVE TO SEPARATE RH AND RC TERMINAL RH THERMOSTAT1 R Y G W NON HP NORMAL REV VALVE B FAN GAS OPP CALL 20 LOCKOUT NONE PRIORITY ALL HEAT PUMP DUAL FUEL O ELEC/HP 15 ACTIVE ZONE1 RC Y G W1 EH W2 O/B EQUIPMENT FLASHING WHEN NORMAL E 2 C C J2-SHORT CYCLE PROTECTION EMERGENCY HEAT Y ON G OFF Z1-PO COM C Z1-PC 24V Z2-PO 24C COM Z2-PC 3 Figure 5 10 DAMPER 2 PWR W DAMPER 1 THERMOSTAT2 R 4
Warranty Braeburn Systems LLC warrants each new Braeburn zone panel against any defects that are due to faulty material or workmanship for a period of five years after the original date of purchase by a professional service technician. This warranty and our liability does not apply to merchandise or the zone panel resulting from accident, alteration, neglect, misuse, improper installation or any other failure to follow Braeburn installation and operating instructions.