Specifications

S
E
R
V
I
C
EC
O
RD &
L
OOMFR
OM BA
S
E
O
FCOOL
E
R
P
OWEROUT
L
E
T
A
T
T
A
C
H
E
DT
O
R
A
F
T
E
RB
E
A
M
5
0
m
m
H
O
L
E
T
O
B
E
C
U
TIN
T
OSI
D
E
OF D
ROP
P
E
R
PASS PLUG AND
CONTROL WIRING
THROUGH GROMMET
SCREW GROMMET
TO THE DROPPER
AS SHOWN
COOLER
CONTROL
WIRING
CONNECT PLUG
TO OUTLET
9
INSTALLATION
Electrical Connection
9
10
11
¾ Connection
z
Down Discharge Units
A hole is provided in the side of the
blower housing for electrical entry.
The mains lead and control cable are
passed through this hole and wired to
the control box. On installation pass the
cables through the hole into the dropper
and then into the roof cavity.
z
Side Discharge Units
Knock outs are provided on the outlet
panel for mains and control cable loom.
Alternatively, entry can be made to the
unit from beneath. The entry must be on
the flat raised centre section of the tank
above the water line and directly below
the blower housing. Use only water tight
fittings and thoroughly seal all entry
points.
z
Top Discharge Units
Entry for mains and control cable loom
can be made through the cabinet Top.
Alternatively, entry can be made to the
unit from beneath. The entry must be on
the flat raised centre section of the tank
above the water line and directly below
the blower housing. Use only water tight
fittings and thoroughly seal all entry
points.