Operation Manual
GB
version ECopyright Bravilor Bonamat B.V.24 1.0
D Remove the plug from the filling opening for
the descaler solution (E.).
− The filling opening of the hot water boiler (E.)
is found before the spray head (D.) .
D Place the supplied funnel in the filling opening
and carefully pour the descaler solution into the
opening.
D Press, after having poured in the descaler
solution, the confirmation key (L.).
− The first level block appears on the display
and the hammer symbol flashes (fig. 24 ).
− The hot water boiler is filled with water and
warmed up. This takes some time.
G
H
I
J
KLM
N
Fig. 24 First level descaling programme hot water
system
TIP
− Pour yourself hot water in the hot water boiler
unto the lime edge. This accelerates the
descaling process.
G
H
I
J
KLM
N
Fig. 25 Pause for interaction of the descaler
− When the water is hot, a sandglass and a
flashing hammer symbol appears on the
display (fig. 25 ). A 5 minutes waiting time
follows to let the renegite do its job.
− When the signal sounds and the level blocks
on the display flash, the hot water boiler must
be emptied through the hot water tap.
D Put the tap in the blocking position (push the
handle as far backward as possible) and empty
the boiler.
D Discharge the last bit of water by pulling up the
overflow pipe (S.).
D Close the hot water tap.
D Press the confirmation key (L.) to confirm that
the boiler is empty.
− The second level block appears on the
display.
− The hot water boiler is filled and the hammer
symbol flashes on the display.
− When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.
D Discharge the last bit of water through the
overflow pipe. For this pull up the overflow pipe
(S., fig. 22 ).
D Press the confirmation key (L.) to confirm that
the boiler is empty.
− The third level block appears on the display.
− The hot water boiler is filled and the hammer
symbol flashes on the display.
− When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.
D Discharge the last bit of water through the
overflow pipe. For this pull up the overflow pipe
(S., fig. 22 ).
D Close the hot water tap.
D Press the confirmation key (L.) to confirm that
the boiler is empty.
− The fourth level block appears on the
display.
− The hot water boiler is filled for the last time
and the hammer symbol flashes on the
display.
− When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.