Operation Manual

GB
version ECopyright Bravilor Bonamat B.V.24 1.0
D Remove the plug from the filling opening for
the descaler solution (E.).
The filling opening of the hot water boiler (E.)
is found before the spray head (D.) .
D Place the supplied funnel in the filling opening
and carefully pour the descaler solution into the
opening.
D Press, after having poured in the descaler
solution, the confirmation key (L.).
The first level block appears on the display
and the hammer symbol flashes (fig. 24 ).
The hot water boiler is filled with water and
warmed up. This takes some time.
G
H
I
J
KLM
N
Fig. 24 First level descaling programme hot water
system
TIP
Pour yourself hot water in the hot water boiler
unto the lime edge. This accelerates the
descaling process.
G
H
I
J
KLM
N
Fig. 25 Pause for interaction of the descaler
When the water is hot, a sandglass and a
flashing hammer symbol appears on the
display (fig. 25 ). A 5 minutes waiting time
follows to let the renegite do its job.
When the signal sounds and the level blocks
on the display flash, the hot water boiler must
be emptied through the hot water tap.
D Put the tap in the blocking position (push the
handle as far backward as possible) and empty
the boiler.
D Discharge the last bit of water by pulling up the
overflow pipe (S.).
D Close the hot water tap.
D Press the confirmation key (L.) to confirm that
the boiler is empty.
The second level block appears on the
display.
The hot water boiler is filled and the hammer
symbol flashes on the display.
When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.
D Discharge the last bit of water through the
overflow pipe. For this pull up the overflow pipe
(S., fig. 22 ).
D Press the confirmation key (L.) to confirm that
the boiler is empty.
The third level block appears on the display.
The hot water boiler is filled and the hammer
symbol flashes on the display.
When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.
D Discharge the last bit of water through the
overflow pipe. For this pull up the overflow pipe
(S., fig. 22 ).
D Close the hot water tap.
D Press the confirmation key (L.) to confirm that
the boiler is empty.
The fourth level block appears on the
display.
The hot water boiler is filled for the last time
and the hammer symbol flashes on the
display.
When the signal sounds and the level blocks
on the display flash, the hot water boiler
must be emptied again through the tap.
D Put the tap in the blocking position and empty
the boiler.