Instruction for Assembly
! Diagonals of a framework of a box have to be equal.
5. Insert a bottom of a box (11) into a groove of sidewalls
(10,12) and a slip (9) a white surface down and fix it by nails (F-
01) to a back wall box (14) (picture 1).
! Separate directing (R-02) on two parts (R-02/1 and R-02/2) by
means of pressing of a lever (picture 2) moved apart a guide.
6. Fix to sidewalls of a
box (10, 12) ball guides (R-02/1)
by screws of Ø4х13 mm (E-03)
according to a headdress of Ø3
mm (picture 1).
! Twist screws in the
openings extended vertically
"", for a possibility of further
adjustment of a box in the direction up/down.
7. Fix handles (M-01) to an overlay (9) by means of screws
for the handle (E-08) through laying under the screw for the
handle (D-05) if necessary.
! Laying under the screw for the handle (D-05) can be
absent in a complete set in the absence of need for
them.
! Collect other boxes in the similar way.
- fix to a cover (4) and a low horizontal wall (6) by means of
an euroscrew of Ø6,3x13 mm (E-07) through the nipple
goniometer (J-01).
21. Insert shelfholders (I-01) in openings of Ø5mm in
sidewalls (1, 2) and partitions (13, 15) according to the picture 15.
! Shelf holders (I-01) are inserted into any of three (five)
openings, depending on that what height of unit is necessary
for you (you watch fig. 15).
22. Install shelves (5) on shelf
holder (I-01).
23. Install boxes in an
aperture on guides (R-02/2) (picture
13).
! At the first installation of a box
on guides (R-02/2) it comes into
an aperture very hardly – be not
frightened it! To develop guides
at installation of boxes make
back and forth motions of a box forward - back (with small
pass of a box in the case for a step) until a full closing. Then
still it is few times put completely forward and push a box
and the guide is developed.
24. If necessary regulate gaps (item 6 in balance of
assembly of a box and item 7 in case balance of assembly).
25. Put doors (16, 17) to false-panels (7, 8 respectively) and
put on cases of loops (L-01/2) overlays of loops (L-01/1).
! If necessary regulate a fit of doors (16,17) and gaps between
them, at the end fix the position of loops screws (picture
16,17,18).
Picture 1
Lever for
dismantling
guide
R-02/ 1
picture 2
I-01
B
5
м
м
picture 15