How to Guide

================================================================================================
L-1762-F11
STEP 6
------------------------------------------------------------------------------
START WITH:
10
+
26
Add a Machinery Bushing to the Axle.
5
Insert the Axle Assembly (10) through the right side plate as illustrated above.
CONTINUE ADDING TO THE AXLE IN THE FOLLOWING ORDER:
12
End Tube Assembly - Face short end toward the side plate (5).
26
Machinery Bushing
13
Center Tube Assembly
26
Machinery Bushing
12
End Tube Assembly - Face short end toward the side plate (5).
26
NOTE:
One (or more) Machinery Bushings (26) can be added to the end of the axle,
on the outside edge (as needed) to eliminate any side play in the axle assembly.
SHORT
END
FACES
OUT
13
12
12
15
15
26
15
15
26
15
15
SHORT
END
FACES
OUT
START
HERE
10
26
26
5
5
ASSEMBLY: 40” Plug Aerator
(
PA-40 BH
)
TIP: SPOTTING
THE DIFFERENCES
BETWEEN TUBES
THESE HAVE
ONE SHORT END
Plate = 1-1/8” from the end of
the tube. The short ends need
to face out, closest to the side
plates (5).
12
End Tube Assemblies
THE ENDS ARE
IDENTICAL LENGTHS
Plates = 2-3/4” from both
ends of the tubes.
13
Center Tube Assembly
VS