Appendix 1: Fuse Replacement
Fuse should be replaced with properly rated fuse: 2 AMP @ 240VAC max.
Do not replace fuse with live power applied to Centipede
2
®
. Only authorized personnel should replace fuse.
1. Remove power from unit.
2. Replace the blown fuse with a new one of the specified amperage.
3. Apply power to unit.
4. If replacement fuse immediately fails, contact BriskHeat
®
for more infor-
mation concerning your issue.
Fuse Location
Left Side View
BriskHeat
®
Corporation. All rights reserved
5
Centipede 2
®
Module System
Instructions
QUICK START GUIDE
1. Install all heaters and ensure that the RTD is making good contact with
the object being heated.
2. Connect modules to heaters. Connect the heaters’ 6-pin power / RTD
connector to each Centipede 2
®
module.
3. Connect each module in the string together using CAT5E
communication cables.
4. Connect the first module to the operator interface using any of the
available input strings (1 - 4).
5. Next, plug in the power to the heaters. Turn on operator interface.
6. In the Global Program menu, select “Global Prog/Select String”. Next,
select the desired string to program. Set all values for low alarm,
set-point, and high alarm. Individual module settings can be adjusted
later.
7. Monitor the Centipede 2
®
system to ensure that each heater achieves
its desired set-point. The time to reach the set-point will vary for each
heater. During this time, you may change individual module settings.
Refer to the rest of this manual for further details and troubleshooting.