Manual

® ALLURE ® QS2 SERIES
IBRO ,N ° .o .ooo
Page 3
PREPARE THE HOOD PREPARE THE HOOD
[_ Remove
Teflon_=coated
bottom cover
from hood.
Set cover and
mounting screws
aside.
Teflon"is a registered
trademark of DuPont.
El Remove
Damper/Duct
Connector
from inside
the hood. Set
connector
aside - with
mounting
screws and
parts bag.
DAMPER/
DUCT
CONNECTOR
Remove either
top or back
wiring knock-
out and install
approved
Electrical
Cable Clamp.
TEFLONQCOATED BOTTOM COVER
(Held in place with 2 screws)
ELECTRICAL CABLE CLAMP
El Remove Air
Chute - h_]d in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
El Remove Baffle
from air chute.
AIR CHUTE
\
BAFFLE
BAFFLE
\
Non-Ducted installation - Skip to Step 15.
The following
Steps (6 thru
14) are for
DUCTED
iNSTALLATiON
ONLY.
(3) #8 SCREWS LIGHT
PANEL
El
Rotate baffle. Re-
insert baffle into air
chute (as shown) so
that baffle tabs fit all
the way into slots in
air chute. An audible
"click" will be heard
when fully installed.
This will close off
the air flow through
the non-ducted slots
on top of hood.
SLOTS
TABS
[_ Remove Panel held in with #8
Light place (3)
screws
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
El
Re-install air chute, re-connect wire
harness, and replace light panel.
NOTE: Be careful not to trap wires
between support fin and light panel.
SUPPORT FIN