Manual
B N
ALLURE ® QS3 SERIES
RANGE HOOD
Page 3
PREPARE THE HOOD
TEFLONC°_-COATEDBOTTOM COVER
(Held in place with 2 screws)
ELECTRICAL CABLE CLAMP
PREPARE THE HOOD
El Remove
Teflon_coated
bottom cover
from hood.
Set cover and
mounting screws
aside.
Teflon"is a registered
trademark of DuPont.
[_ Remove
Damper/Duct
Connector
from inside
the hood. Set
connector
aside - with
mounting
screws and
parts bag.
DAM PER/
DUCT
CONNECTOR
El Remove either
top or back
wiring knock-
out and install
approved
Electrical
Cable Clamp.
El Remove Air
Chute - h_ in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
El Remove Baffle
from air chute.
AIR CHUTE
BAFFLE
BAFFLE
\
Non-Ducted installation - Skip to Step 15.
The following
Steps (6 thru
14) are for
DUCTED
iNSTALLATiON
ONLY.
(3) #8 SCREWS LIGHT
PANEL
E]
Rotate baffle. Re-
insert baffle into air
chute (as shown) so
that baffle tabs fit all
the way into slots in
air chute. An audible
"click" will be heard
when fully installed.
This will close off
the air flow through
the non-ducted slots
on top of hood.
SLOTS
TABS
El Remove _ht Panel - held in place with (3) #8 screws
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
E]
Re-install air chute, re-connect wire
harness, and replace light panel.
NOTE: Be careful not to trap wires
between support fin and light panel.
SUPPORT FIN