Installation guide
BROAN
ALLURE®
QSE1
SERIES
RANGE
HOOD
PREPARE
THE
HOOD
i
DAMPER/DUCT
CONNECTOR
Remove
Damper/Duct
Connector
from
inside
the
hood.
Set
connector
aside
-
with
mounting
screws
and
parts
bag.
WIRING
COVER
Remove
Wiring
Cover
from
inside
the
hood.
Set
cover
and
mounting
screw
aside.
-\
ELECTRICAL
CABLE
CLAMP
Remove
either
top
or
back
wiring
knockout
and
install
ap-
proved
Electrical
Cable
Clamp.
Page
3
PREPARE
THE
HOOD
TOP
RECTANGULAR
DUCT
KNOCKOUT
(Remove
for
314”x
10”
Vertical
Discharge)
REAR
RECTANGULAR
DUCT
KNOCKOUT
(Remove
for
314”x
10”
Horizontal
Discharge)
[e]
Remove
appropriate
Duct
Knockout(s)
from
top
or
back
of
hood.
TAPE
TOP/BACK
UP
TO
1”
EDGE
SIDE-TO-SIDE
ADJUSTMENT
PIVOT
DAMPER/DUCT
CONNECTOR
(Vertical
discharge
position
shown)
3%”
x
10”
Ducted
Discharge
Only:
Attach
Damper/Duct
Connector
over
knockout
opening.
Make
sure
damper
Pivot
is
nearest
to
Top/Back
Edge
of
hood.
Remove
Tape
from
damper
flap.
NOTE
|
Damper/Duct
Connector
can
be
installed
up
to
1-inch
on
either
side
of
hood
center
to
accomodate
off-center
ductwork.
In
extreme
off-center
installations,
one
end
of
the
duct
connector
may
need
to
be
trimmed
to
clear
the
electrical
cable
clamp.