Installation guide
Table Of Contents
- Contents
- Preface
- About This Document
- Brocade 5100 Introduction
- Brocade 5100 Installation and Configuration
- Brocade 5100 Operation
- Removal and Replacement of Combined Power Supply and Fan Assembly (Port-side Air Exhaust)
- Brocade 5100 Technical Specifications
- Regulatory Statements
- Cautions and Danger Notices
- Index

About This Document
● Supported hardware and software.................................................................................... 9
● What’s new in this document............................................................................................ 9
Supported hardware and software
Although many different software and hardware configurations are tested and supported by Brocade
Communications Systems, Inc. for Fabric OS v6.1.0, documenting all possible configurations and
scenarios is beyond the scope of this document.
This document is specific to the Brocade 5100 and Fabric OS v6.1.0. To obtain information about a
Fabric OS version other than v6.1.0, see the documentation specific to that OS version.
What’s new in this document
• An illustration indicating the port numbers and the port groups is added.
• A chapter on removal and replacement of power supplies and fan assemblies is added.
• All references to EIA cabinet have been changed to EIA rack since closed cabinets are not supported
by Brocade products.
• The regulatory compliance statements are moved to a new chapter/appendix.
‐ China CCC certification has been updated from “GB17625.1-2003 or latest” to
“GB17625.1-2012 or latest”.
‐ Laser compliance statement is removed.
‐ The Japan VCCI statement has been updated.
‐ China RoHS compliance statements are removed and a reference to the latest independent
China RoHS compliance document is added.
• A new chapter/appendix on cautions and danger notices is added with translation in multiple
languages.
Brocade 5100 Hardware Installation Guide
9
53-1000854-07