Component Assurance Activity:
The evaluator shall prepare a test plan and report documenting the testing aspects of the system.
The test plan covers all of the testing actions contained in the CEM and the body of the NDPP’s
Assurance Activities. While it is not necessary to have one test case per test listed in an Assurance
Activity, the evaluator must document in the test plan that each applicable testing requirement in
the ST is covered.
The test plan identifies the platforms to be tested, and for those platforms not included in the test
plan but included in the ST, the test plan provides a justification for not testing the platforms. This
justification must address the differences between the tested platforms and the untested platforms,
and make an argument that the differences do not affect the testing to be performed. It is not
sufficient to merely assert that the differences have no affect; rationale must be provided. If all
platforms claimed in the ST are tested, then no rationale is necessary.
The test plan describes the composition of each platform to be tested, and any setup that is
necessary beyond what is contained in the AGD documentation. It should be noted that the
evaluator is expected to follow the AGD documentation for installation and setup of each platform
either as part of a test or as a standard pre-test condition. This may include special test drivers or
tools. For each driver or tool, an argument (not just an assertion) should be provided that the driver
or tool will not adversely affect the performance of the functionality by the TOE and its platform.
This also includes the configuration of the cryptographic engine to be used. The cryptographic
algorithms implemented by this engine are those specified by the NDPP and used by the
cryptographic protocols being evaluated (IPsec, TLS/HTTPS, SSH).
The test plan identifies high-level test objectives as well as the test procedures to be followed to
achieve those objectives. These procedures include expected results. The test report (which could
just be an annotated version of the test plan) details the activities that took place when the test
procedures were executed, and includes the actual results of the tests. This shall be a cumulative
account, so if there was a test run that resulted in a failure; a fix installed; and then a successful re-
run of the test, the report would show a 'fail' and 'pass' result (and the supporting details), and not
just the 'pass' result.
5.2.5 Vulnerability assessment (AVA)
5.2.5.1 Vulnerability survey (AVA_VAN.1)
AVA_VAN.1.1d
The developer shall provide the TOE for testing.
AVA_VAN.1.1c
The TOE shall be suitable for testing.
AVA_VAN.1.1e
The evaluator shall confirm that the information provided meets all requirements for content and
presentation of evidence.
AVA_VAN.1.2e
The evaluator shall perform a search of public domain sources to identify potential vulnerabilities
in the TOE.
AVA_VAN.1.3e
The evaluator shall conduct penetration testing, based on the identified potential vulnerabilities, to
determine that the TOE is resistant to attacks performed by an attacker possessing Basic attack
potential.
Component Assurance Activity:
As with ATE_IND, the evaluator shall generate a report to document their findings with respect to
this requirement. This report could physically be part of the overall test report mentioned in