Installation Guide Owner's manual
Table Of Contents
- Introduction
- Hardware Installation
- Installation instructions
- Precautions
- Access Point placement
- Integrated antenna model wall mount instructions
- Integrated antenna model suspended ceiling t-bar mount
- External antenna model wall mount instructions
- External antenna model suspended ceiling t-bar mount
- External antenna suspended ceiling tile (Plenum) mount
- Mobility 1220 Access Point external antenna model antenna options
- LED indicators
- Initial Access Point Configuration
- Specifications
- Regulatory Information
- Country Approvals
- Health and Safety Recommendations
- Health and Safety Recommendations
- RF Exposure Guidelines
- Wireless Devices - Countries
- Radio Frequency Interference Requirements—FCC
- Radio Frequency Interference Requirements – Canada
- CE Marking and European Economic Area (EEA)
- Statement of Compliance
- Waste Electrical and Electronic Equipment (WEEE)
- TURKISH WEEE Statement of Compliance
- Mobility 1220 China ROHS Compliance

Initial Access Point Configuration
3
Brocade Mobility 1220 Access Point Installation Guide 47
53-1002916-01
If a screen shows settings not intended as part of the initial configuration, the
screen can be selected from within the Navigation Panel and its settings
modified accordingly.
33. If the configuration displays as intended, select the Save/Commit button to
implement these settings to the Access Point’s configuration. If additional
changes are warranted based on the summary, either select the target page
from the Navigational Panel, or use the Back and Next buttons to scroll to the
target screen.