Installation Procedure (Supporting VDX 6740T) Instruction Manual

6 of 12 Universal Two-Post Rack Kit Installation Procedure
53-1002943-01
Attaching front brackets to the rack
Complete the following steps to install the switch in the rack.
1. Position the switch in the rack (Figure 3), providing temporary support under the switch until the rack kit is fully
secured to the rack.
2. Attach the right front bracket to the right rack upright using two 10-32 x 5/8-in. screws and two retainer nuts as
shown in Figure 3. Use the top and bottom holes in the bracket.
3. Attach the left front bracket to the left rack upright using two 10-32 x 5/8-in. screws and two retainer nuts.
4. Tighten all the 10-32 x 5/8-in. screws to a torque of 25 in-lbs. (29 cm-kgs).
FIGURE 3 Attaching front brackets to a rack
1 Screws, 10-32 x 5/8-in., panhead Phillips 2 Retainer nuts, 10-32