Installation Guide

Base
Paver
BROCK
®
For all Patios and Walkways
The base is the most important step in your patio and walkway projects.
STEP 9
CLEAN THE SURFACE OF THE
PAVERS
Once you are done spreading the polymeric sand into the gaps,
use a leaf blower to blow the fine dust off the surface of your patio.
(You want to make sure you sweep it off well first or you will
generate a large dust cloud!) DO NOT WASH IT OFF WITH WATER!
THAT COMES LATER. If the patio is not free of polymeric sand on
the surface of the pavers, you may see a film/haze on the pavers
once you follow step 9.
Once the surface of the patio is completely clean, follow the
instructions for wetting on the packaging of the polymeric sand.
This will entail lightly spraying the joint sand with water several
times which will activate the polymer that hardens the sand.
HOW TO INSTALL
PATIOS AND WALKWAYS
New Project – (replacing grass/dirt)
Now you can enjoy your new project!
PROJECT QUESTIONS?
CALL TIM NEWTON ANYTIME AT: 813.431.8259