Installation Guide

STEP 1: EXPAND THE AREA FOR PATIO PAVERS
Most commonly this is removing a grass area that is around your current concrete patio. You will
incorporate this area into your new larger outdoor patio design. You will need to excavate about
1” deep from the surface of your current concrete slab for the area of your extended patio.
MATERIAL REMOVAL GUIDE
How deep you need to dig is determined by
adding the thickness of the following components:
EXAMPLE
Leveling Sand
Paver Thickness*
Brock PaverBase
Dig out this many inches
below your current level
1/2 Inch
1 3/4 Inch
7/8 Inch
3 Inches
+
+
=
Thickness
*will depend on the paver you select.
STEP 2: LEVEL AND COMPACT THE BASE
Using a hard rake and/or shovel, level the area and
make sure it follows the slope of the concrete pad.
The ground should be tightly compacted using a
hand tamper or plate compactor. The slope should
be about 1/4 per one foot of distance. It is helpful
to pull a string line so you can check your slope. To
run a string line, attach a string to a fixed point on
the house side about 3” above the surface of the
patio, and pull it tight toward the outside edge of
your new patio area. Attach the other end to a
landscape stake in the ground making sure the
string it tight. Use a level and ruler to create the
desired slope. For example, the patio should slope
2.5 over a 10 foot distance (Diagram below). This
will ensure that the patio moves water away from
the house.
The area should be as smooth as possible, making
sure to get rid of high and low spots to within +/- 1/4.
This is now your compacted base. Congratulations,
the hard part is over!
HOW-TO INSTRUCTIONS:
Using Pavers or Patio Stones -
Concrete/Patio Overlay
Paver Base
For all Paver Patios and Walkways

Summary of content (7 pages)