PRODUCT Mae Lila Step 2: Air Gap Faucet Installation Faucet installation 1. Unpack the faucet, and Insert the Top Spot Into the Main Body by pushing down until inserted, then screw the Top Cap clockwise until secured in place. 2. Cut zip tle on the per-installed blue water connection tubing, and unroll to straighten. Be careful not to cut the tube when removing the zip te. 3. Connect the V-inch oranges brine input tubing.
90 PREHENSILE Masai an Step 2: Air Gap Faucet! Installation 5. Attach the Escutcheon to the Milan Body by Inserting the blue faucet tubing, orange brine input tubing, and black drain tubing {3 bes) through the Escutcheon. Tilde the Escutcheon all the way up until connected io the Main Body. 6. install the faucet on top of the counter top or sink, and feed all three tubes through the hole to the cabinet below. 7.
PRODUCT Mae Lila Step 3: Drain Clamp Installation Before Installation You will need to have these tools (not included) for the following installation: 1) drill, 2) 14-inch drill bit, and 3} drill bit ia WARNING: This stein may require drilling Into the existing drain pipe. Please satchel professional help when completing this step, and always wear safely protection including safety gondolas! 1. Locate a suitable area on the sin drain pipe to install the provided drain clamp.
92 PREHENSILE Masai an Step 3: Drain Clamp Installation bs. Insert the and of the glued Into the hole In the drain pipe, and slide the clamp with the foam against the pipe, fining up both holes. Take the back half of the drain clamp and position it against the back side of the drain pipe. Screw the bolts through both halves of the drain camp, and apply the nuts to secure. Do not over tighten. . Once the drain clamp Is secure on the pipe, remove the guide. 4.
Proudhon a Ans Step 4: Filter Head Connection Assembly Installation 4a He sure to install the Filter Head Connection Assembly so that the top of the assembly is at least 14 inches firm the floor of the sink cabinet. Charade, the Tillers will not Install comely. 1. Using a pencil, mark where the Filter Head Connection Assembly will be mounted to the sidewall of the cabinet {at least 14 inches from the cabinet floor). Use a level to make sure that the Assembly will be mounted straight.
PREHENSILE Masai an Step 5: Filter installation 1. Ris very important to install the filters in the ” & Ei correct order. Match the same color label on Filter Head each filter to the color label on the Filter Head Connection from left to right: v 1} Activated Carbon Plus Filter = 2) EURO Membrane Flier Fi Defoe 3} Carbon Block Filter Step 2 2. Yo insert the filters, line up the arrow on the filter head with the arrow on the filter. 3.
Pao Ee ai Step 6: Water Storage Tank Prep/Using "Buick Connectors” 4 WARNING: DO NOT tamper with the alr valve cap on the font of the water storage tank it has been prose at Opel. 1. Apply Teflon tape around the threaded outlet on top of the water storage nk. 2. Screw the Tina Ball Rive tightly ~ h to the top of the tank. 3. Place the tank on the tank stand with the valve upright, and position it underneath the sink next to the system assembly.
i PREHENSILE Masai an Step 7: Connecting the Tube 1. Water Supply Connection a. Measure the distance from your Valve to where you have installed the filter head assembly, and cut the white, Water Supply Tubing. Insert one end of the tubing firmly Into the Quick Connect fitting on the open side of the Twelve. Be sure to push in all the way, and ensure the tubing Is not bent or kinked.
PRODUCT Mae Lila Step 7: Connecting the Tube 4. Tank Connection a. Measure out the white Water Supply Tubing, and carefully cut a piece for connecting the tank, Locate the Shut-off Valve Assembly. insert one end of the tubing firmly into the Quick Connect on the assembly. Be sure to push in all the way, and ensure the tubing Is not bent or kinked. b. Unscrew the side cap from the Tank Ball Valve located on top of the tank. Take the cap and firmly slide the opposite end of the white tube through the cap. ¢.
18 en la Chechen for Leaks/Flushing the System Tum on Water & Check for Le ales NOTE: Boors Wining the cold water on, review the Installation Instructions to ensure that he Twelve ond water Hosts are connected correctly and securely. 1. Turn on water supply a. Open the T-valve by turning the valve arm 90° as shown, b. Turn the cold-water supply valve at the wall counterclockwise to turn on. The cold-water supply will then begin to supply water to the Capella. 2. Checking for leaks a.
PREPS ENG Se Lal Walter Pressure Water Pressure Traditional RO systems run on water pressure. Your incoming water pressure has a direct effect on how well your RO system will perform, With sufficient water pressure (max 100 psi), your RQ system will function well and fill up the storage tank quickly. To test your water pressure, you can use a water pressure gauge from your hardware store they connects onto your sink or garden faucet Turn on the water all the way to FULL, and take a reading.