User guide

2-2
Section 2 Installation
Model GT1000 Series
Installation and Operation Manual
X-VA-GT1000-eng
Part Number: 541B078AAG
March, 2014
2-4 Return Shipment
Prior to returning any instrument to the factory visit the Brooks website
www.BrooksInstrument for a Return Materials Authorization Number (RMA#),
or contact one of the following locations:
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554 FLOW (3569)
Tel (215) 362 3700
Fax (215) 362 3745
E-mail: BrooksAm@BrooksInstrument.com
www.BrooksInstrument.com
Brooks Instrument Brooks Instrument
Neonstraat 3 1-4-4 Kitasuna Koto-Ku
6718 WX Ede, Netherlands Tokyo, 136-0073 Japan
P.O. Box 428 Tel +81 (0) 3 5633 7100
6710 BK Ede, Netherlands Fax +81 (0) 3 5633 7101
Tel +31 (0) 318 549 300 Email: BrooksAs@BrooksInstrument.com
Fax +31 (0) 318 549 309
E-mail: BrooksEu@BrooksInstrument.com
All flow instruments returned to Brooks requires completion of Form
RPR003-1, Brooks Instrument Decontamination Statement, along with a
Material Safety Data Sheet (MSDS) for the fluid(s) used in the instrument.
Failure to provide this information will delay processing by Brooks personnel.
Copies of these forms can be downloaded from the Brooks website
www.BrooksInstrument.com or are available from any Brooks Instrument
location listed above.Instrument must have been purged in accordance with
the following:
2-5 Transit Precautions
To safeguard against damage during transit, transport the instrument to the
installation site in the same container used for transportation from the factory
if circumstances permit.
2-6 Installation
A. Location
For proper operation of the GT 1000 flowmeter it must be mounted within
6 degrees of true vertical, with the inlet connection at the bottom of the
meter, and the outlet at the top. The use of a plumb-bob, level or other
device to assure vertical positioning is recommended.