Install Instructions

F O R M
Q-D
®
Instructions
F20-23
Revised
May 2010
Periodic inspections should be performed. Failure to perform proper maintenance
can result in premature product failure and personal injury.
All electrical work should be performed by qualified personnel and compliant with
local and national electrical codes.
To avoid damage, supporting structure including shafts and bearings must be designed
to handle transmitted loads and belt tension(s).
Failure to use the cap screws that came with the Product may lead to an
unsafe assembly.
Before Installation:
1. Make sure the shaft, bushing barrel and bore, Q-D bushed product bore, key and keyway are
free of burrs, paint etc. Make sure the key, as applicable, will slide in both shaft keyseat and
bushing bore keyway.
2. For proper operation, make sure the shaft size is within the size limits shown in Table 1. Some
applications may benefit from tighter shaft tolerances.
ILLUSTRATION 1A - - QD ASS‘Y, FLANGE IN BOARD
REVERSE MOUNT
JA-J
STD. MOUNT
(MOST SIZES)
JA-P
Disconnect and lock-out power before installation and maintenance. Working on or
near energized equipment can result in severe injury or death.
Do not operate equipment without guards in place. Exposed equipment can result
in severe injury or death.
Read and follow all instructions carefully.
NOTICE: Lubricant on bushing barrel, hub or screws could lead to breakage.
NOTICE:
Mounting a Q-D® Bushing on a shaft smaller than the size limits shown in Table 1 may result in
a faulty assembly. The assembly may come off the shaft or undesirable assembly runout may result.
Emerson Industrial Automation
7120 New Bufngton Road
Florence, KY 41042
Application Engineering: 800 626 2093
www.emerson-ept.com
Browning, Emerson, Emerson Industrial Automation and Q-D are trademarks of
Emerson Electric Co. or one of its affiliated companies.
©1998, 1999, 2000, 2009, 2010 Emerson Power Transmission, All Rights Reserved.
MCIM10015 F20-23 Printed in USA

Summary of content (4 pages)