Use and Care Manual
Rev: 4.5/15/12 Brush Master™ Chipper/Shredder with 2-Way Feed
9
T
Assembly
IMPORTANT: This unit is shipped without gasoline or oil in the
engine. Be certain to fill the engine with gasoline and oil as
instructed before operating your machine.
Required tools: Two 13mm wrenches
NOTE: Both wrenches are supplied in the hardware bag.
Approximate assembly time: 15 minutes
1. Remove the chipper from its carton
Remove plastic banding and cut the tape on the top of the
box.
3. Verify all chipper components are present (Figure 1)
Item 1: Engine/chipper body/wheels subassembly
Item 2: Lower leaf funnel section
Item 3: Upper leaf funnel section with entry shield
Item 4: Handle section and leaf funnel base
Item 5: Discharge chute with deflector
NOTE: Fill out and submit missing parts request form on
page 4 should any parts be missing.
4. Verify all parts are in the hardware bag (Figure 2)
Goggles (eye protection)
Wrenches for assembly and blade maintenance
Allen wrench for blade maintenance
Oil funnel with flexible neck
Spark plug wrench
Owner’s Manual
Hardware: eleven 20mm long bolts, two 30mm long
bolts, two 45mm long bolts, 26 flat washers, 4 locking
washers and 11 nylon locking nuts
Figure 2
2. Remove the shipping frame (item 6) from item 1
The steel shipping frame (item 6) is banded to the base of
the chipper at the engine mounting location. Cut these
bands with scissors or a knife to remove the chipper from
the shipping frame. The shipping frame can be discarded.
Bolt Identification:
Place top of bolt head here
Actual Size
20mm
45mm 30mm
Figure 1
1
2
3
4
5
6