Form No. 7700 (Rev.
TM Bryan Knockdown boilers for stage-by-stage entry through most standard door openings Replace old inefficient boilers without extra construction expense Sizes from 29 BHP to 191 BHP Bryan offers a large selection of hot water and steam industrial and commercial boilers that have been designed for delivery to the site partially assembled in an easy-toknockdown configuration. Reassemble inside The individual components will all easily fit through standard door openings.
Step-by-step how to do it Bryan KnockdownTM boilers Disassembly 1. RV Series boiler shown. This is KD-4 condition as the boiler is delivered to the job site. 2. After unbolting clips remove burner. 3. Remove control devices, gauges and valves, jacket access doors and panels. Jacket panels are fastened with single screws. 4. Flanges are color coded with their mates to make correct reassembly easy. White stripes guide accurate realignment. 5. Jacket frames are tack welded and coded for easy reassembly.
TM Select the Knockdown solution for your replacement problem Dimensions and Weight for CLM Series Knockdown Construction Steam Frame With Tubes Installed (in Inches and Pounds) Water Frame Without Tubes Installed With Tubes Installed Boiler Base Without Tubes Installed Atmospheric Forced Draft Model BHP LxWxH Wgt. LxWxH Wgt. LxWxH Wgt. LxWxH Wgt. LxWxH Wgt. LxWxH* CLM-120 29 48x35x56 965 48x17x56 478 48x32x48 796 48x10x48 309 43x36x19 260 47x36x28 Wgt.