Operating instructions
IX. ELECTRICAL CONNECTIONS
A. 115-v Wiring
Refer to unit rating plate or Table 6 for equipment electrical
requirements. The control system requires an earth ground for
proper operation.
CAUTION: Do not connect aluminum wire between
disconnect switch and furnace. Use only copper wire.
Make all electrical connections in accordance with the current
edition of the National Electrical Code (NEC) ANSI/NFPA
70-1999 and any local codes or ordinances that might apply. For
Canadian installations, all electrical connections must be made in
accordance with CSA C22.1 Canadian Electrical Code or authori-
ties having jurisdiction.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, the furnace control status LED will flash
rapidly and prevent heating operation.
Fig. 6—Furnace, Plenum, and Subbase Installed on a Com-
bustible Floor
A96285
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
Fig. 7—Furnace, Plenum, and Coil Assembly or Coil Box
Installed on a Combustible Floor
A96284
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
FURNACE
SHEET METAL
PLENUM
FLOOR
OPENING
COMBUSTIBLE
FLOORING
WARNING: Do not install furnace on its back. Safety
control operation will be adversely affected. Never con-
nect return-air ducts to back of furnace. Failure to follow
this warning could result in fire, personal injury, or death.
A93043
FRONT
BACK
FRONT
B
A
C
K
Fig. 8—Typical Gas Pipe Arrangement
A89414
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
—9—
→