User's Manual

Assembling the Equipment Upon Arrival
Your ER System will arrive on several skids. The shipping company will place the ER Platform (including
the base and post) in the location you specify to them. The post is attached to the base by four screws
with an Allen key. The Computer Management Stand is to be placed to the right of the system. The
FROM pegboard may be placed anywhere in close proximity to the system (no more than 20 feet away).
All the equipment must be assembled on a level surface.
The following is the recommended order in which to assemble your equipment:
Place the ER Stand where you would like to have it
Assemble the Computer Management Stand to the right of the ER Stand
Assemble the FROM pegboard
Assemble tools on Computer Management Stand
Connect the computer
It is recommended while unpacking the equipment that you review your packing slip, to make sure you
have received all the required parts. If there is anything missing from the shipment please contact
Customer Service immediately so replacements can be provided.
Computer Management Stand Setup
The computer management stand is partially assembled when you receive it. To complete assembly you
will need to attach three shelves at the front of the stand and one shelf at the bottom back of the stand in
order for it to be fully operational.
Required Tools and Equipment:
8 X 1” screws
Allen Key
Phillips or square head screwdriver
Dismount/Assembly of Computer Stand
To identify the front of the stand locate the Hanoun sticker at the top. The back of the stand is
distinguished by a random series of holes.
To dismount the Computer Stand from the skid unscrew and loosen the bolts near the bottom rails (as
shown below). There is a bolt near each wheel. When the bolts are removed, slide the stand off the skid.
Shelf 1 is the shelf with the keyboard drawer attached to it. This shelf will support the computer monitor.
It needs to be screwed to the top set of rails on the stand.
Bolts that secure
stand to skid.