User's Manual

Table Of Contents
mBSC-H DAS System
Installation Manual Issue 7
© 2009-2014, BTI Wireless Page 32
NOTE: When using multiple RU enclosures to support more than one RF band,
each RU is supporting a different frequency. When routing the coaxial antenna
cable, it is critical that the appropriate frequency band cable be connected to the
same frequency type RU.
1. Remove the dust cap from the DIN female connector located on the bottom of the enclosure. The port
is labeled with “ANT”.
2. Route the coaxial antenna cables from the antenna to the bottom of the enclosures.
3. Cut the antenna cable to the required length and terminate with the appropriate connector.
4. Connect the antenna cable to the antenna port labeled with “ANT”, Figure 4-15.
Figure 4-15. DIN Female Connector
4.2.5.6 AC Power Cable Connection
Danger: Use extreme caution when working with high voltage AC power. Ensure all power is
disconnected before working on power circuit.
Warning: Verify that the Unit has been ground with an earth-bonding cable to the grounding
connector.
Use the following procedure to install the AC Power cable:
1. Route the power cable between the AC power port, located on the bottom of the enclosure and the
nearest AC power junction box as shown Figure 4-16.