Use the following steps to connect the optical fibers:
1. Obtain one patch cord which is sufficient length to reach from fiber optic distribution box to fiber
CM-BTS chassis.
2. Remove the dust caps the optical ports and from the patch cord connectors that will be connected.
3. Clean each patch cord connector following the patch cord suppliers recommendation.
4. Screw-thread secures the patch cord connector into the optical port on the fiber optic distribution
box.
Figure 34Fiber Optic Cable Connection to Fiber CM-BTS Enclosure
5. Route the patch cords from the fiber optic distribution box to the designated optical port on the
chassis of the fiber CM-BTS enclosure.
6. Identify each optical fiber.
4.4.2.5 AC Power Connection
Danger
Use extreme caution when working with high voltage AC power. Ensure all power is disconnected before working on power
circuit.
Warning
Verify that the unit has been ground with an earth-bonding cable to the grounding connector.
A connectorized 4-wire power cable is provided with the unit enclosures for the AC power connection, as
shown in Figure 36. The connectorized end of the power cable connects to the AC power port located on the
bottom of the enclosure.
The AC power source must supply 110/220V AC(+/20% @50/60Hz) through a 15 Amp circuit breaker. The
AC power cable provides the wire leads for line, neutral and ground connections. The power cable must be
routed from the cabinet to an electrical junction box for connection to the AC power source. The power cable
is rated for indoor or outdoor use. Refer to the following procedure to install the AC power wiring:
1. Locate the AC power junction box which is located at the bottom of the Remote Node mounting
bracket as shown in Figure 35.