Commissioning the heating system
Logano G115 WS US/CA – 6 720 813 418 (2019/09) 33
6.10 Commissioning log
Initial and date the commissioning steps carried out.
Commissioning operations Page Readings taken Comments
1. Fill heating system and check for leaks 21
____________ psi
Heating system pressure
2. Bringing the system up to operating pressure
bleeding heating system
Testing relief valve
adjust the expansion tank pressure ( see the expansion tank manufacturer’s
documentation)
28
____________ psi
3. Checking combustion air supply and flue system
4. Checking position of heat exchanger baffles 29
5. Switching on the controls and burner ( controls' documentation) 29
6. Checking flue gas temperature and raising if required 30
____________ °F
7. Checking the manual reset high limit (STB) 32
8. Adjusting the controls settings to suit the customer's requirements ( controls'
documentation)
9. Informing the end user and handing over technical documentation
Confirmation of properly completed commissioning Company stamp/signature/date
Inform the customer about the correct fuel and correct
operating pressure. Enter the details in the table
( boiler operating instructions).