Installation Manual
Table Of Contents
- Contents
- 1 Safety Considerations and Symbol Descriptions
- 2 Product description
- 3 Moving the boiler
- 4 Installing the boiler
- 5 Installing the boiler
- 6 Commissioning the heating system
- 6.1 Bringing the system up to operating pressure
- 6.2 Checking the safety valve
- 6.3 Checking position of heat exchanger baffles
- 6.4 Preparing the heating system for operation
- 6.5 Starting up the control and the burner
- 6.6 Notes on commissioning the burner
- 6.7 Raising flue gas temperature
- 6.8 Manual reset high limit (STB)
- 6.9 Installing the burner door jacket
- 6.10 Commissioning log
- 7 Shutting down the heating system
- 8 Heating system servicing
- 9 Troubleshooting
- 10 Installation examples
- 11 Parts lists
- 12 Circuit diagrams
- Index
5
Installing the boiler
Logano G115 WS US/CA – 6 720 813 418 (2019/09) 25
5.8.1 Fitting the controls
▶ Position the tabs of the controls in the slots.
▶ Slide the controls forwards towards the burner door.
▶ Let the flexible hooks of the control panel click into the openings by
pushing the control panel down.
Fig. 20 Fitting the controls
[1] Flexible catches
[2] Locating tabs
[3] Slots
[4] Locating holes
▶ Remove the controls cover.
– Unscrew the cover screws.
▶ Secure the controls with self-tapping screws.
Fig. 21 Cover, removing
[1] Cover screws
[2] Self-tapping screws
1
2
3
7 747 019 141-21.1RS
1
2
7 747 019 141-22.1RS