Installation Manual

Table Of Contents
8
Heating system servicing
Logano G115 WS US/CA – 6 720 813 418 (2019/09)38
8.6 Servicing and maintenance logs
Initial and date the servicing operations completed. The inspection and servicing logs can also be used as copy masters.
Service work Page Date:______ Date:______ Date:______
1. Check general condition of heating system
2. Visual inspection and function check of the heating system
3. Checking fuel and water-carrying components of the system for:
•leaks during operation
•leak test
•visible signs of corrosion
•signs of ageing
4. Check the combustion chamber and the heating surface for
contamination; shut down the system for this step
34
5. Checking the burner ( burner documentation)
6. Check the combustion air supply and flue gas routing for function and
safety
7. Check the operating pressure, relief valve and expansion tank inlet
pressure
37
8. Checking function of DHW tank and sacrificial anode ( DHW tank
documentation)
9. Checking controls settings ( controls' documentation)
10. Record the final checks of the inspection work, incl. measurements
and test results
Confirmation of properly completed servicing Company stamp/
signature
Company stamp/
signature
Company stamp/
signature