- 6 Commissioning the heating system
- 6.1 Bringing the system up to operating pressure
- 6.2 Checking the safety valve
- 6.3 Checking position of heat exchanger baffles
- 6.4 Preparing the heating system for operation
- 6.5 Starting up the control and the burner
- 6.6 Notes on commissioning the burner
- 6.7 Raising flue gas temperature
- 6.8 Manual reset high limit (STB)
- 6.9 Installing the burner door jacket
- 6.10 Commissioning log
- 7 Shutting down the heating system
- 8 Heating system servicing
- 9 Troubleshooting
- 10 Installation examples
- 11 Parts lists
- 12 Circuit diagrams
- Index
8
Heating system servicing
Logano G115 WS US/CA – 6 720 813 418 (2019/09)38
8.6 Servicing and maintenance logs
▶ Initial and date the servicing operations completed. The inspection and servicing logs can also be used as copy masters.
Service work Page Date:______ Date:______ Date:______
1. Check general condition of heating system
2. Visual inspection and function check of the heating system
3. Checking fuel and water-carrying components of the system for:
•leaks during operation
•leak test
•visible signs of corrosion
•signs of ageing
4. Check the combustion chamber and the heating surface for
contamination; shut down the system for this step
34
5. Checking the burner ( burner documentation)
6. Check the combustion air supply and flue gas routing for function and
safety
7. Check the operating pressure, relief valve and expansion tank inlet
pressure
37
8. Checking function of DHW tank and sacrificial anode ( DHW tank
documentation)
9. Checking controls settings ( controls' documentation)
10. Record the final checks of the inspection work, incl. measurements