Installation Manual
Table Of Contents
- Contents
- 1 Safety Considerations and Symbol Descriptions
- 2 Product description
- 3 Moving the boiler
- 4 Installing the boiler
- 5 Installing the boiler
- 6 Commissioning the heating system
- 6.1 Bringing the system up to operating pressure
- 6.2 Checking the safety valve
- 6.3 Checking position of heat exchanger baffles
- 6.4 Preparing the heating system for operation
- 6.5 Starting up the control and the burner
- 6.6 Notes on commissioning the burner
- 6.7 Raising flue gas temperature
- 6.8 Manual reset high limit (STB)
- 6.9 Installing the burner door jacket
- 6.10 Commissioning log
- 7 Shutting down the heating system
- 8 Heating system servicing
- 9 Troubleshooting
- 10 Installation examples
- 11 Parts lists
- 12 Circuit diagrams
- Index
8
Heating system servicing
Logano G115 WS US/CA – 6 720 813 418 (2019/09) 39
Date:______ Date:______ Date:______ Date:______ Date:______ Date:______ Date:______
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
If any condition requiring maintenance work is identified
in the course of servicing, that work must be carried out
as necessary to ensure safe and proper operation.