- 6 Commissioning the heating system
- 6.1 Bringing the system up to operating pressure
- 6.2 Checking the safety valve
- 6.3 Checking position of heat exchanger baffles
- 6.4 Preparing the heating system for operation
- 6.5 Starting up the control and the burner
- 6.6 Notes on commissioning the burner
- 6.7 Raising flue gas temperature
- 6.8 Manual reset high limit (STB)
- 6.9 Installing the burner door jacket
- 6.10 Commissioning log
- 7 Shutting down the heating system
- 8 Heating system servicing
- 9 Troubleshooting
- 10 Installation examples
- 11 Parts lists
- 12 Circuit diagrams
- Index
8
Heating system servicing
Logano G115 WS US/CA – 6 720 813 418 (2019/09)40
On-demand maintenance procedures Page Date:______ Date:______ Date:______
1. Shutting down the heating system 34
2. Removing and cleaning the heat exchanger baffles 36
3. Cleaning heat exchanger heater flue (heating surfaces) and
combustion chamber and afterwards refitting heat exchanger baffles in
original positions
36
4. Checking seals/cord gaskets on burner door and burner and replacing
as necessary
36
5. Commissioning the heating system 29
6. Final check of the servicing work
7. Checking safe and proper operation
Confirmation of properly completed servicing Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Date:______ Date:______ Date:______ Date:______ Date:______ Date:______ Date:______
1.
2.
3.
4.
5.
6.
7.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature