Installation Manual
Table Of Contents
- Contents
- 1 Safety Considerations and Symbol Descriptions
- 2 Product description
- 3 Moving the boiler
- 4 Installing the boiler
- 5 Installing the boiler
- 6 Commissioning the heating system
- 6.1 Bringing the system up to operating pressure
- 6.2 Checking the safety valve
- 6.3 Checking position of heat exchanger baffles
- 6.4 Preparing the heating system for operation
- 6.5 Starting up the control and the burner
- 6.6 Notes on commissioning the burner
- 6.7 Raising flue gas temperature
- 6.8 Manual reset high limit (STB)
- 6.9 Installing the burner door jacket
- 6.10 Commissioning log
- 7 Shutting down the heating system
- 8 Heating system servicing
- 9 Troubleshooting
- 10 Installation examples
- 11 Parts lists
- 12 Circuit diagrams
- Index
2
Product description
Logano G115 WS US/CA – 6 720 813 418 (2019/09) 7
2.6 Pack contents
Upon delivery, check that the packaging is complete and undamaged.
Component Qty Packaging
Boiler heat exchanger 1 1 pallet
Boiler casing, factory-fitted to
boiler heat exchanger
Burner door and burner door panel,
factory-fitted to boiler heat
exchanger
B-kit components:
• 1 Supply manifold G115"US"
• elbow 90 ° 1-1/4"
• elbow 90 ° 3/4"
• double nipple R1-1/4"-1-1/4"
NPT x 75
• boiler drain 3/4"
• relief valve 3/4" x 3/4" 30PSI
• temperature/pressure gauge
• Bolt set B-Kit G115"US"
• adjustable boiler feet M10 x 51
packed
1 1 foil package
1)
1) in the combustion chamber in the boiler
Technical documentation 1 foil package
Table 1 Package Contents