Install Instructions

5
Installing the boiler
Logano G115 WS US/CA – 6 720 813 418 (2014/10) 17
5 Installing the boiler
This chapter details how to install your boiler correctly. The individual
steps involved are:
Connecting the flue
Connecting the water pipes
Making the electrical connections
Fitting the burner
Connecting the fuel supply
5.1 Flue pipe installation
5.1.1 Chimney venting
Connect boiler to vertical chimney with a 5" vent pipe. Use only venting
systems that comply with local codes and regulations.
If local codes are not existent, refer the the following regulations:
NFPA 31, Installation of Oil-Burning Equipment,
NFPA 211, Standard for Chimneys, Fire Places and Solid Fuel
Burning Appliances,
In Canada refer to CSA B139, Installation Code for Oil-Burning
Equipment,
NFPA 211 requires chimney to be lined before connecting boiler.
Inspecting and cleaning existing flue
Before installing the new boiler, check and clean the old flue system.
Remove blockages and dirt from the chimney.
Clean chimney.
Repair or replace faulty sections.
If necessary, repair chimney with mortar and joints.
Down drafts
To prevent down drafts extend chimney at least 3 feet
above the roof opening and at least 2 feet above any part
of the roof within a radius of 10 feet.