Installation/Maintenance Guide

4
Transport and set-up
Logano G201 - Subject to technical modifications.
14
4.2 Installing the boiler block
4.2.1 Installation requirements for the set-up
room
4.2.2 Wall clearances
Wherever possible, position the boiler with the recom-
mended wall clearances. Reducing the wall clearances
makes the boiler more difficult to access.
The non-combustible boiler base or foundation must be
perfectly flat and level. If the foundation is not level, the
connection side (rear) can be 0.2 inches higher for
improved bleeding and air flow. The foundation must be
larger than the boiler footprint – by at least 48 inches in
the front and approx. 24 inches on the rear. The base
must be able to bear the weight of the boiler. We recom-
mend a stable concrete base.
Fig. 7 Wall clearances
Caution: Risk of system damage due to
frost!
If the heating system has been switched off,
it may freeze up in cold weather conditions.
V Install the heating system in a frost-free
room.
Danger: Risk of death from explosion and
fire!
The storage of explosive or easily-flammable
materials near the boiler can create life-
threatening situations.
V Do not store easily-combustible and ex-
plosive materials (paper, curtains, cloth-
ing, thinners, paints, etc.) near the boiler.
V Maintain a clearance of 24 inches from the
boiler.
Dimension Wall clearances
A 48"
B 24"
C6"
Top 24"
Flue gas line from combus-
tible materials
18"
Tab. 7 Wall clearances (dimensions in inches)
We recommend placing the boiler on a
2 – 4 inch high non-combustible base.