8 Commissioning
This chapter explains how to commission the heating sys-
tem for the first time.
V Complete the commissioning report during this pro-
cess (Æ Chapter 8.6, page 36).
Danger: Risk of fatal accident due to chim-
ney fire!
V Before initial commissioning, have the
chimney checked by the local chimney in-
staller.
V If soot ignites, close all ventilation ducts to
the boiler and the fuel space door.
V Check flue pipe for leaks.
V Do not make any constructional changes
to the boiler.
Warning: System damage and risk of injury
in case of incorrect commissioning!
V Only have the appliance installed or al-
tered by an approved heating contractor.
V Before the initial commissioning, check
whether the heating system is filled up
with water and bled.
Warning: Risk of injury from open boiler
doors!
V Do not open the fuel filler door of the boiler
during operation.
Warning: Risk of injury from too-high tem-
perature of the flue gas header!
V Avoid touching the flue gas header during
operation.
Warning: Risk of system damage due to in-
correct operation!
V Instruct the customer or system operator
about the operation of the appliance.