Installation/Maintenance Guide

2
Information about the appliance
Logano G201 - Subject to technical modifications.
4
2 Information about the appliance
This installation and maintenance manual contains impor-
tant information for the safe and correct installation, initial
commissioning, and maintenance of this boiler.
This manual is intended for qualified technicians with
experience and training in heating systems.
For operating information about the boiler, see the operat-
ing instructions.
2.1 Designated use
The Logano G201 solid fuel boiler is a heating boiler for
coal and wood firing (split log firing) in single and multi-
family houses. In order to ensure proper use, please
observe the details on the rating plate and the specifica-
tions to ensure proper use of this appliance.
2.2 Standards, regulations and direc-
tives
Boiler usage conditions
The heat exchanger has been designed and certified in
accordance with the ASME Boiler and Vessel Code,
Section IV.
Maximum boiler temperature: 200 °F
Maximum operating pressure:
50 psi
2.3 Installation tips
When installing the heating system, observe the following
requirements:
Local building regulations regarding the installation
conditions
Local building code regulations regarding combustion
air supply and flue gas systems
Regulations and standards regarding safety equipment
of the heating system
2.4 Operating tips
When operating the heating system observe the follow-
ing:
V The boiler may only be operated by adults who are
familiar with the instructions and boiler operation.
V Make sure that children are not allowed in the vicinity of
the boiler unsupervised when it is in operation.
V Do not use any fluids for lighting or boosting the boiler.
V Empty the ashes into a non-flammable container with a
lid.
V Do not place or store any flammable objects near the
filling or combustion chamber or at a safety distance of
at least 24 inches around the boiler.
V Do not place any flammable objects on the boiler.
V Only clean the surface of the boiler with non-flammable
cleaners.
V Do not store any flammable materials in the boiler room
(e.g. petroleum, oil).
V Do not use any flammable liquids for heating.
V While the boiler is operating, do not exceed the rated
output of the boiler (overheating).
V Store ashes in a fireproof container with a closed
cover.
V Operate the boiler at a maximum temperature of 194 °F
and check it regularly during operation.
V Operate the boiler with a minimum return temperature
of 131 °F. Ensure that this temperature limit is adhered
to with a suitable set-up.
V The minimum boiler water temperature must be above
131 °F, because with a lower temperature, flue gases
can condense. This has negative consequences for the
proper operation of the boiler and its life span.
V The boiler operator must follow the operating instruc-
tions.
V The boiler operator may only commission the boiler,
take the boiler out of operation, and clean it. All other
work must be performed by an authorized service com-
pany.
V The service technician is obligated to inform the boiler
operator about the operation and the correct, safe
operation of the boiler.
V In case of danger of explosion, fire, escaping combus-
tible gases or vapors (e.g. vapors that arise when glu-
ing linoleum, PVC, etc.), do not operate the boiler.
V Heed the flammability of building materials.
Follow local regulations and standards dur-
ing installation and operation!
Installation of the heating system must be
performed by an approved and qualified
installer according to the valid standard
NFPA-31 "Installation of solid fuel systems".
The installation must correspond to the na-
tional and local standards and rules. For the
USA/Canada, the standards UL391/CSA/
CAN B366.1 must be adhered to.
Only use original Buderus spare parts. Bud-
erus assumes no liability for damage caused
by the use of parts not supplied by Buderus.