Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
46
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Placing the boiler in operation9
9.9 Start-up protocol
z Sign all start-up work as completed and enter the
relevant date.
Start-up steps Page Value measured Comments
1. Filling system and checking for leaks 36
__________ psi
2. Set operating pressure
vent heating system
check operation of pressure relief valve
adjust the expansion tank pressure (Î see the expansion tank
manufacturer's documentation)
42
__________ psi
3. Check combustion air and venting system
5. Turn on control (Î refer to control service manual) 43
6. Turn on burner (Î see burner manual) 43
7. Measure flue gas temperature (adjust if required) 44
__________ °F
8. Check high limit cut-off (STB) 45
9. Adjust the control settings to customer's requirements (Î control service
manual)
10. Inform end user and hand over instructions
Confirm start-up procedure
Company stamp/signature/date