Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
16
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.1 Assembly when delivered in sections
z Assemble all boiler sections in accordance with the
following instructions and diagrams.
7.1.1 Preparing boiler sections
z Position the rear section onto two wood blocks.
z Clean the boiler hubs with sandpaper and a rag.
z Remove any burrs with a file.
z Clean the packing spring or packing groove with a
wire brush and rag.
z Clean the hub sealing faces with a rag soaked in
cleaning agent.
z Evenly coat the boiler hub sealing faces with red lead
putty.
z Coat the packing spring or packing groove with
adhesive (adhesive base).
Fig. 5 Remove burrs
1 Boiler hubs
2 Back section
3 Wood blocks
4 Sealing spring
3
1
2
1
4
CAUTION!
RISK TO HEALTH and
DANGER OF BURNS
due to released vapors and easily
flammable cleaning agents.
z When using red lead putty, adhesives
and solvents ensure adequate
ventilation inside the installation room.
z When using solvents, avoid open
flames, incandescence and sparks.
z Please observe the manufacturer's
handling and safety instructions.
Fig. 6 Coat boiler hubs with red lead putty
1 Boiler hub sealing face
2 Sealing spring
1
1
2