Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
18
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.1.4 Inserting the section sealing
z Unroll the required length of section sealing from the
roll supplied.
z Peel the backing paper from the sealing rope as you
insert the cord into the packing groove.
z Insert the flexible sealing rope into the packing
groove starting in the upper boiler hub area, and
lightly press in.
z Overlap sealing rope 3/4" at the joins and press in
well.
7.1.5 Knock intermediate section into place
z Turn the intermediate section around and locate with
the upper and lower boiler hubs on the nipples of the
rear section.
z Drive the intermediate section onto the rear section
using a wood or a rubber mallet.
Fig. 9 Inserting the section sealing rope
CAUTION!
SYSTEM DAMAGE
due to leaking boiler sections.
z To ensure that the faces between the
boiler sections are sealed correctly
never stretch the sealing rope during
application.
z Carefully insert the sealing rope into the
boiler section packing grooves.
Fig. 10 Knock intermediate section into place
1 Wood or rubber mallet
2 Rear section
1
2