Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
24
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
7.1.11 Positioning the flue outlet
The flue outlet comes with sealing rope already fitted.
z Remove the washers and nuts from the threaded
studs.
z Position the flue outlet on both threaded studs on the
back section and secure with nuts.
7.1.12 Sealing boiler hubs
The reducer included with the B-Kit is required for fitting
the boiler fill and drain valve (boiler fill & drain valve).
The boiler fill & drain valve is also a component of the
B-Kit.
z Seal with teflon tape or paste the reducer into the
bottom boiler hub at the back of the boiler.
z Install the boiler fill & drain valve on the reducer.
z Close the top boiler hub on the front section with the
blank flange.
z Screw in the plug with the flat gasket into the lower
boiler hub.
Fig. 23 Fitting the flue outlet
Fig. 24 Sealing the reducer
1 Reducer
1
Fig. 25 Seal boiler hubs at the front section
1 Blank flange
2 Plug
1
2