Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
30
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler block assembly7
Installing thermal insulation
z Position the thermal insulation over the boiler block.
z Push the thermal insulation below the boiler block in
the direction of the arrow.
z Position the thermal insulation tabs in front of the top
tie-bar and draw them together with a spring clip.
Fitting the side panels
The side panels are fitted identically on each side (r.h.
side panel shown here)
z Push the snap nut onto the angled sheet steel of the
side panel until it locks into the hole provided.
z Push the side panel into the angled part of the bottom
cross bar.
Fig. 37 Installing thermal insulation
1 Spring clip
2 Thermal insulation tabs
2
1
Fig. 38 Positioning snap nut (here: r.h. side panel)
Fig. 39 Push in the bottom front corner of the side panel
1 Angled part of the bottom cross bar
1