Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
Boiler block assembly 7
31
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
z Slightly lift the side panel.
z Hook the side panel upper cutout into the upper tie-
bar.
z Hook the rear part of the side panel to the extended
hook.
z Push against the lower end of the side panel and
secure with the rear panel using the snap nut.
Installing the top front boiler cover
z Hook the front boiler cover with its cutout into the
upper tie-bar and push back.
z Secure the front boiler cover with two self-tapping
screws to the side panels.
Fig. 40 Slot side panel into place
1 Top tie-bar
2 Extended hook
1
2
Fig. 41 Fasten the side panel to the rear panel with screws
1 Snap nut
1
Fig. 42 Installing the front boiler cover
NOTICE
Installation of the back boiler cover
(Î Chapter 8.8, page 41).