Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
Boiler installation 8
35
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
8.2 Installation of water connections
8.2.1 Installing B-Kit:
The relief valve and the pressure/temperature gauge are
mounted on the conversion nipple (included in B-Kit) on
the VK boiler supply connection as follows:
z Measure length of thread on R1¼" × 1¼" NPT
double nipple.
z Seal supply manifold to connection VK with the long
side to the boiler.
z Seal conversion nipple on boiler inlet VK.
z Seal pressure/temperature gauge to conversion
nipple.
8.2.2 Installation of boiler drain (included in B-Kit)
z Install the boiler fill and drain valve with seal to
connector EL.
z Seal boiler drain to connection EL.
Fig. 46 Installing B-Kit
1 Supply manifold
2 Pressure/temperature gauge
1
2
VK
RK
Fig. 47 Installing B-Kit
1 90°-elbow 1¼" NPT
2 Pressure relief valve
3 Conversion nipple 1" x ¾"
1
2
3
NOTICE
Do not install the pressure relief valve until
after the leak test (Î Chapter 8.3,
page 36).
The pressure relief valve must be installed
in a vertical position.
Fig. 48 Installation of boiler drain
EL