Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
Boiler installation 8
39
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
8.7 Electrical connections
This section only applies to boilers using Buderus
controls.
8.7.1 Fitting the Logamatic control panel
z Locate the push-in hooks of the Logamatic control
panel in the slots.
z Push the control panel towards the burner door.
z Let the flexible hooks of the control panel click into
the openings by pushing the control panel down.
z Remove the Logamatic control panel cover. First
remove the cover screws.
z Secure the control panel with self-tapping screws.
WARNING!
DANGER TO LIFE
from electric shock.
z Only qualified electricians are permitted
to carry out electrical work.
z Before you open the control: shut off
electrical supply and secure against
accidental activation.
z Please observe all installation
instructions.
Fig. 53 Fitting the control panel
1 Flexible hooks
2 Locking tabs
3 Slots
4 Openings
1
4
2
3
Fig. 54 Removing the cover
1 Cover screws
2 Self-tapping screws
1
2