Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
54
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Boiler maintenance11
On-demand maintenance procedures Page Date: ______ Date: ______ Date: ______
1. Shut down the heating system 47
2. Remove and clean the flue baffles 49
3. Clean the (heating surfaces) and combustion chamber, then re-
install the flue baffle plates in their original position.
49
4. Check and, if required, replace gaskets/sealing rope on the burner
door and burner
50
5. Start up the heating system 43
6. Carry out final check of the maintenance work
7. Check the function and safety in operation
Confirm professional maintenance
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Date: ______ Date: ______ Date: ______ Date: ______ Date: ______ Date: ______ Date: ______
1.
2.
3.
4.
5.
6.
7.
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature