Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
Table of Key Words 16
69
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
16 Table of Key Words
A
Anchor rods . . . . . . . . . . . . . . . . . . . . 22
Aquastat
. . . . . . . . . . . . . . . . . . . . . . 38
Assembly of boiler sections
. . . . . . . . . . . . 16
B
B-Kit components: . . . . . . . . . . . . . . . . . 12
Blank flange
. . . . . . . . . . . . . . . . . . . . 24
Boiler back panel
. . . . . . . . . . . . . . . . . 28
Boiler block
. . . . . . . . . . . . . . . . . . . . 58
Boiler block leak test
. . . . . . . . . . . . . . . . 25
Boiler fill & drain valve
. . . . . . . . . . . . . . . 24
Boiler room
. . . . . . . . . . . . . . . . . . . . . . 5
Burner door
. . . . . . . . . . . . . . . . . . . . 58
Burner door installation
. . . . . . . . . . . . . . 27
Burner installation
. . . . . . . . . . . . . . . . . 37
Burner, guidelines for starting up
. . . . . . . . . 43
C
Cable entry . . . . . . . . . . . . . . . . . . . . . 32
Capillary tubes
. . . . . . . . . . . . . . . . . . . 40
Check the temperature safety cut-out (STB)
. . . 45
Checking for leaks (heating water side)
. . . . . . 36
Circuit diagrams
. . . . . . . . . . . . . . . . . . 65
Clearances
. . . . . . . . . . . . . . . . . . . . . 14
Combustion chamber
. . . . . . . . . . . . . . . 49
Compression tool
. . . . . . . . . . . . . . . . . 19
Connect electrical power supply
. . . . . . . . . . 41
Correcting burner faults
. . . . . . . . . . . . . . 55
D
Disposal . . . . . . . . . . . . . . . . . . . . . . . 5
Distribution tube
. . . . . . . . . . . . . . . . . . 22
E
Emergency stop switch – heating system . . . . . 47
F
Fitting adjustable feet . . . . . . . . . . . . . . . 26
Fitting the control panel
. . . . . . . . . . . . . . 39
Fitting the side panels
. . . . . . . . . . . . . . . 30
Fitting the tie-bars
. . . . . . . . . . . . . . . . . 29
Flue outlet
. . . . . . . . . . . . . . . . . . . . . 24
H
Heating circuits, multiple . . . . . . . . . . . . . . 56
Hinge lobes
. . . . . . . . . . . . . . . . . . . . 28
Hinge pins
. . . . . . . . . . . . . . . . . . . . . 27
Hot gas baffle plates, removing
. . . . . . . . . . 49
Hot gas flues, cleaning
. . . . . . . . . . . . . . . 49
I
If you notice a smell of gas . . . . . . . . . . . . . 4
Initial start-up
. . . . . . . . . . . . . . . . . . . 42
Inserting the hot gas baffle plates
. . . . . . . . . 27
Installation diagram
. . . . . . . . . . . . . . . . 36
Installation of boiler drain
. . . . . . . . . . . . . 35
Installation of the boiler jacket
. . . . . . . . . . . 28
Installing B-Kit
. . . . . . . . . . . . . . . . . . . 35
Installing boiler fill and drain valve
. . . . . . . . . 35
Installing the boiler cover
. . . . . . . . . . . . . 31
Installing the burner door jacket
. . . . . . . . . . 45
Installing the temperature sensor set
. . . . . . . 40
Installing thermal insulation
. . . . . . . . . . . . 30
Insulation
. . . . . . . . . . . . . . . . . . . . . . 30
L
L.h. closing . . . . . . . . . . . . . . . . . . . . . 27
Leaking boiler block
. . . . . . . . . . . . . . . . 25
M
Main shut-off valve . . . . . . . . . . . . . . . . . 43
Main switch
. . . . . . . . . . . . . . . . . . . . . 47
Maintenance procedure
. . . . . . . . . . . . . . 54
Maintenance, subject to demand
. . . . . . . . . 48
O
ON/OFF switch . . . . . . . . . . . . . . . . . . . 47
On-site test pressure
. . . . . . . . . . . . . . . . 37
Original components
. . . . . . . . . . . . . . . . .4
P
Pressure relief valve . . . . . . . . . . . .35, 37, 42
Pressure test port
. . . . . . . . . . . . . . . . . 44
Pressure/temperature gauge
. . . . . . . . . . 42, 51
Protocol, start-up
. . . . . . . . . . . . . . . . . . 46
Protocols, inspection and maintenance
. . . . . . 52
Providing a fuel supply
. . . . . . . . . . . . . . . 38
R
Raising flue gas temperature . . . . . . . . . . . 44
Routing the burner cable
. . . . . . . . . . . . . . 40
S
Sealing rope, replacing . . . . . . . . . . . . . . . 50
Sealing the boiler hub
. . . . . . . . . . . . . . . 24
Sensor well
. . . . . . . . . . . . . . . . . . . . . 23
Sensor wire
. . . . . . . . . . . . . . . . . . . . 40
Shutting down
. . . . . . . . . . . . . . . . . . . 47
Side panels
. . . . . . . . . . . . . . . . . . . . . 30
Strain relief installation
. . . . . . . . . . . . . . . 41
Supply/return header
. . . . . . . . . . . . . . . . 22
T
Technical information . . . . . . . . . . . . . . . .7
Test port
. . . . . . . . . . . . . . . . . . . . 23, 40
Tools
. . . . . . . . . . . . . . . . . . . . . . . . .5
Troubleshooting
. . . . . . . . . . . . . . . . . . 55
W
Wet cleaning . . . . . . . . . . . . . . . . . . . . 50