Install Instructions
Table Of Contents
- 1 Safety Considerations
- 2 Product Description
- 3 Technical information
- 4 Packaging and Components
- 5 Moving the boiler
- 6 Placing the Boiler
- 7 Boiler block assembly
- 7.1 Assembly when delivered in sections
- 7.2 Check for leaks
- 8.2 Installation of water connections
- 8.2.1 Installing B-Kit:
- 8.2.2 Installation of boiler drain (included in B-Kit)
- 8.2.3 Installation of system components
- 8.3 Filling heating system and checking for water leaks
- 8.4 Burner installation
- 8.5 Providing a fuel supply
- 8.6 Aquastat installation
- 8.7 Electrical connections
- 8.7.3 Electrical connections and connection of additional components
- WARNING!
- 8.7.4 Strain relief installation
- 8.8 Jacket panel installation
- 9 Placing the boiler in operation
- 9.9 Start-up protocol
- 11.3 Boiler cleaning
- 11.6 Inspection and maintenance protocols
- 16 Table of Key Words
8
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers • Issue 11/2004
We reserve the right to make any changes due to technical modifications.
Technical information3
3.2 Operating conditions
If the operating conditions listed on the following page
are maintained, long and trouble-free operation of the
boiler can be expected. Some details relate only to
operation with Logamatic control panels from Buderus.
Boiler model 215/3 215/4 215/5 215/6 215/7
Total boiler length (L) Inch 26 ¼ 31 35 ¾ 40 ½ 45 ¼
Boiler block length (LK) Inch 22 26 ¾ 31 ½ 36 ¼ 41
Boiler section insert (width; height; depth) Inch – 18
1
/
8
; 32 ¼; 5
7
/
8
Boiler block insert (width; height; depth) Inch 18
1
/
8
; 32 ¼; Length LK
Combustion chamber length Inch 16 ¾ 21 ½ 26 ¼ 31 35 ¾
Combustion chamber diameter Inch 13 ¼
Burner door thickness Inch 3 ¾
Burner pipe diameter (DB) Inch 4
3
/
8
5
1
/
8
Hole circle diameter (DL) Inch 5
7
/
8
6 ¾
Distance between boiler feet (FL) Inch 13 ¼ 18 22 ¾ 27 ¼ 32
Dry weight
1
lbs 400 500 600 700 800
Tab. 2 Dimensions, weight and other data for boilers without burners
1
Weight incl. packaging material approx. 6 – 8 % more.
CAUTION!
SYSTEM DAMAGE
Deviating from the stated operating
conditions may lead to faults. Major
deviations may lead to the destruction of
individual components or of the boiler.
z Observe the details on the boiler rating
label, which are decisive. Please
always observe these.