Install Instructions

Boiler block assembly 7
33
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers Issue 2014/10
Fitting the cable entry
z Screw the cable entry to the hole in the boiler back
panel.
7.5 Positioning and leveling the boiler
z Position the boiler in its final location.
z Level the boiler horizontally by turning the adjustable
feet and using a spirit level.
Fig. 43 Fitting the cable entry
Fig. 44 Leveling the boiler horizontally