Install Instructions

Boiler installation 8
43
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G215 US oil/gas-fired boilers Issue 2014/10
8.8.3 Electrical connections and connection of additional components
Install a permanent electrical power connection in
accordance with local codes.
z Route all cables through the cable entries to the
Logamatic control panel and connect in accordance
with the wiring diagram.
8.8.4 Strain relief installation
Secure all cable runs with cable ties (included with the
control):
z Insert the cable ties together with the cable from the
top into the slots of the clamp frame (step 1).
z Push the cable tie down (step 2).
z Push against the tie (step 3).
z Flick the toggle up (step 4).
8.9 Jacket panel installation
z Locate and secure the Logamatic control panel top
device cover.
z Fit the rear boiler cover.
WARNING!
RISK OF FIRE
Hot components may damage electrical
wiring.
z Ensure that all wiring is routed in the
ducts provided or on the boiler
insulation.
Fig. 56 Securing cables with cable ties
Fig. 57 Install the back boiler cover
1 Control panel cover
2 Back boiler cover
21