Installation Instructions

5
Installing the boiler
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
17
5 Installing the boiler
This chapter details how to install your boiler correctly.
The individual steps involved are:
Connecting the flue
Connecting the water pipes
Making the electrical connections
Fitting the burner
Connecting the fuel supply
5.1 Flue pipe installation
5.1.1 Chimney venting
Connect boiler to vertical chimney with a 5" vent pipe.
Use only venting systems that comply with local codes
and regulations.
If local codes are not existent, refer the the following reg-
ulations:
NFPA 31, Installation of Oil-Burning Equipment,
NFPA 211, Standard for Chimneys, Fire Places and
Solid Fuel Burning Appliances,
In Canada refer to CSA B139, Installation Code for Oil-
Burning Equipment,
NFPA 211 requires chimney to be lined before con-
necting boiler.
Inspecting and cleaning existing flue
Before installing the new boiler, check and clean the old
flue system.
V Remove blockages and dirt from the chimney.
V Clean chimney.
V Repair or replace faulty sections.
V If necessary, repair chimney with mortar and joints.
Down drafts
To prevent down drafts extend chimney at
least 3 feet above the roof opening and at
least 2 feet above any part of the roof within
a radius of 10 feet.